CPD Presentation: Design considerations for ventilation and smoke control systems when refurbishing a commercial or industrial building

refurbishing_a_commercial_or_industrial_building-1.jpgCare has to be taken when changing the use or layout of such buildings to ensure that such changes won’t impact on the ability of the system to function as originally designed. New walls may be built, mezzanine floors added, production processes altered or fire loads increased. All such changes may make a significant difference.

In this presentation we will provide examples from both industrial and commercial buildings where we have assisted users to make alterations to their ventilation systems, and will provide some rules of thumb. 

Webinar

This presentation is available to watch online now as a recorded webinar. To access, please fill in the form opposite. If you would like us to issue you with a CPD Certificate then please fill out our evalutation form.

The presentation slides for this webinar can be downloaded here.

Upcoming webinars

All webinars are at 12:30 UK time.

  • 2021 webinar calendar is currently being arranged and will be updated soon.

Please complete this form to access the webinar